BUILD DAY sixty five

Tuesday 25th February 2014

back flashing fitted

Success (with a little help from Adrian who basically rescued me from flashing disaster). The dreaded bendy 7m metal back strip of flashing is fitted. Rather a lot of randomly spaced screws visible for my liking, but it’s done. And the sides too.

I’m having to get used to the fact that the roofing system I’ve chosen is agricultural/industrial and is very difficult to get a neat finish on. This is a bit tough as all the rest of the cabin looks so good.

Learning, learning, learning. . . . .

20140226-082114.jpg

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s